7.9* production costs have almost doubled which is to be expected with a second stoping project coming online.
Union hill is either going to make or break this company. No jorc, but the geos should know what they are doing. (Stoping to start early in the quarter soon and hopefully some of the grades they are getting shortly after that)
Ore coming from Follys north should be better then the limits of last stope. (Anyone know tonne, grade of this stope)? The one after that will be 3.5-5g/t.
- Forums
- ASX - By Stock
- Ann: Quarterly Activities Report
7.9* production costs have almost doubled which is to be...
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.399M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |