HIGHLIGHTS
Mystery access works completed in No 8 Level Drive;
Metallurgical test work yields positive results;
Pilot plant design to produce bullion complete;
Check sampling results confirms grade of Mystery Vein;
Transfer of Rahu permit to NTL completed.
HIGHLIGHTS Mystery access works completed in No 8 Level Drive;...
Add to My Watchlist
What is My Watchlist?