CGN 0.00% 0.0¢ crater gold mining limited

Additional pneumatic jack hammers have been ordered and are...

  1. 25,713 Posts.
    lightbulb Created with Sketch. 1240
    Additional pneumatic jack hammers have been ordered and are enroute to the mine site. These will
    allow more targeted mining on an increased number of mining faces, thus providing additional high
    grade gold material to the processing plant.
    Skid steer loaders were ordered and are expected on site shortly. These will dramatically improve the
    underground bogging operations and also increase the gold bearing tonnage being delivered to the
    processing plant.
    The HGZ mine has for some time been operating at a minimal capacity, however we are confident that
    when the new and refurbished mining equipment is commissioned, allowing the processes as
    mentioned above to be implemented, they will all have a considerable effect in increasing gold
    production at the HGZ mine.
 
watchlist Created with Sketch. Add CGN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.