PLS 1.69% $3.01 pilbara minerals limited

Normally with an EPC procurement the client (or client side...

  1. 2,889 Posts.
    lightbulb Created with Sketch. 241
    Normally with an EPC procurement the client (or client side representative in this case I assume DRA) will provide a high level performance brief and the EPC contractor will be contracted to engineer and design the project. An undersized element could be the fault of the client or the EPC contractor.
    It isn’t always straight forward and with the EPC no longer existing, DRA may have breathed a sigh of relief. Without knowing what is in the contracts between all parties it is not possible to know who is at fault, and even with that information it could still be argued that fault could sit with either party.
    The client (us) needs to be highly sophisticated, and have risk protection in place, hence I’m surprised that people are heralding acclaim on this Wang guy (if I’ve found the right guy) when he looks inexperienced on paper (and also does he still work their??)
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$3.01
Change
0.050(1.69%)
Mkt cap ! $9.059B
Open High Low Value Volume
$3.03 $3.04 $2.96 $47.61M 15.86M

Buyers (Bids)

No. Vol. Price($)
14 168080 $3.00
 

Sellers (Offers)

Price($) Vol. No.
$3.01 137639 2
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.