No, the total processing in 3 months is only 51.2 tonnes @ 27.2g/t for a total of 1.392.7 gms
At a daily rate of 51.2 x 91 days = 4,659.2 tonnes per qrtr x 27,2g/t = 126,730.24 gms divided by 32.15 = 3,941.842 troy ozs @ $AUD2,600 per oz = $10,248,790.79.