This extract from this quarterly report was informative:Process Plant: There was no process plant production during the quarter. All plant facilities are being routinely inspected and maintained in accordance with a C&M program designed to ensure all plant is kept in a state of readiness for a re-start of operations. Sedgman carried out a number of projects during the quarter to rectify defects identified during operations as part of their ongoing warranty obligations. The process water treatment plant was decommissioned and returned to the vendor. The plant had not performed as designed during the operational phase due to feed water specification issues. An alternative water treatment concept has been identified and engineering studies were progressed during the quarter.