The key to getting the ASIC/oz down is doubling the production. Over the next 12 mths by bolting of the float circuit they move into the 5g/t underground reserves and then they move from 60koz to 120kozpa.
Simples
The key to getting the ASIC/oz down is doubling the production....
Add to My Watchlist
What is My Watchlist?