‘FORWARD PLAN – WATTLE DAM GOLD PROJECT
Mineral Resource Estimate Update – With the drilling completed, the Company has commenced an MRE update, aimed at increasing the Redback Gold Mineral Resource and defining high-grade domains within the mineralised system.
Development Studies – In anticipation of a positive MRE update, the Company is progressing geotechnical reviews and metallurgical test work at Redback to be potentially incorporated into development studies.
Reverse Circulation (RC) Drilling - A planned RC campaign in the coming month, aims to test gaps in drilling (below 40m surface) south of Wattle Dam, along the Golden Orb corridor Figure 4. With the new result at Golden Orb, additional drilling is planned to further test the potential of a discrete high-grade shoot at Golden Orb, which is located ~200m west of the Redback Gold Deposit resource.’
‘FORWARD PLAN – WATTLE DAM GOLD PROJECT Mineral Resource...
Add to My Watchlist
What is My Watchlist?