RED 7.78% 41.5¢ red 5 limited

Apart from the AISC, upper limit of range being AUD$1950, and...

  1. 405 Posts.
    lightbulb Created with Sketch. 56
    Apart from the AISC, upper limit of range being AUD$1950, and the unknown of the All in Costs, remember NST where gold sold totalled 404koz at an AISC of A$1,746/oz (US$1,147/oz) and AIC of A$2,243/oz. That is a 28.5% increase in the costs.
    Heaven help RED if their All in Costs were in fact $2506. AISC +28.5%.

    A look at their website poses another problem:

    Now hiring open pit and underground mining professionals

    Open Pit:

    • Mine Surveyor
    • Senior Engineer
    • Production Engineer
    • Survey Technicians
    • Project Geologist
    • Mine Geologist
    • Resource Geologist
    • Logging Geologist - Grade Control

    Underground:

    • Mine Surveyor
    • Senior Engineer
    • Production Engineer
    • Drill and Blast Engineer
    • Resource Geologist
    • Mine Geologist
    • Logging Geologist



    With so many positions vacant who have they got running the joint. Talk about cost pressures

 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
41.5¢
Change
-0.035(7.78%)
Mkt cap ! $1.437B
Open High Low Value Volume
43.5¢ 43.5¢ 41.5¢ $6.599M 15.58M

Buyers (Bids)

No. Vol. Price($)
11 671644 41.5¢
 

Sellers (Offers)

Price($) Vol. No.
42.0¢ 48727 2
View Market Depth
Last trade - 16.10pm 01/05/2024 (20 minute delay) ?
Last
41.8¢
  Change
-0.035 ( 7.24 %)
Open High Low Volume
43.3¢ 43.5¢ 41.8¢ 6182734
Last updated 15.59pm 01/05/2024 ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.