The original plan was to fab the two lots in almost parallel.
PL6 was originally due out of IMEC a month after PL5.
There must have been something that came out of the pre fabrication work flow for PL5 that convinced them to delay the start of PL6. Makes sense tbh.
PL5 was also originally due around now, but that target seems to have slipped a bit too.
- Forums
- ASX - By Stock
- Ann: Quarterly Activity Report & Appendix 4C
The original plan was to fab the two lots in almost parallel....
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 4DS (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.5¢ |
Change
0.001(1.19%) |
Mkt cap ! $149.8M |
Open | High | Low | Value | Volume |
8.4¢ | 8.5¢ | 8.2¢ | $55.52K | 661.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 70280 | 8.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.5¢ | 73922 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 70280 | 0.083 |
1 | 8536 | 0.082 |
3 | 185456 | 0.081 |
10 | 1133183 | 0.080 |
2 | 101211 | 0.079 |
Price($) | Vol. | No. |
---|---|---|
0.085 | 73922 | 1 |
0.086 | 60000 | 1 |
0.087 | 36120 | 2 |
0.088 | 300000 | 2 |
0.090 | 167222 | 6 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
4DS (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online