I wonder why they decided to move the kit from the original site? I know the type of battery they were making is different but if you can re-purpose the equipment then it must have similarities. If this was a data centre move (probably less complex) there is a whole raft of support tech needed. Aircon (not cheap), raised floor, cabling, etc. Then there are all those undocumented 'fixes' made after initial installation to get things going. Not to mention the equipment does not like to be moved. The cost of the move and re-setup will probably be in the millions. A lot of that on support infrastructure.
- Forums
- ASX - By Stock
- Ann: Quarterly Cashflow Report
I wonder why they decided to move the kit from the original...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MNS (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online