I'll be the devils advocate here and will follow up these points.
Snatcher flows will not be 400 bopd per well based on what is written. I understand S1 only flowed for 7 days but it appears that if flowed only just over 200 bopd. I suppose what I don;t know is whether it actually went on pump at all in that initial flow.
Greg;s comments today that S1,2,3 and Tigercat will flow 1000 bopd total is the clincher.
S3 is the unknown as we hit new sands in that well so maybe alot different.
Why is G1 and G2 not on line?????? We have the capacity. I bet its the water thing. Bring on the evap ponds and lets get this Growler field on pump and flowing. Geez Vic Pet Shit me.
Drilling Liberator after 2 development wells. Good chance here I feel with the extension of Snatcher to be proved up.
Sales reciepts numbers down but due to lower output.
The report is uninspiring to me but to be fair I knew all that was there minus a few things so once again Greg being very cagey.
Don;t get me wrong we have a big 6 months ahead.
Add to My Watchlist
What is My Watchlist?