SYA 4.17% 2.3¢ sayona mining limited

Interesting as well that each ' BULK ' rail car on average can...

  1. 12,830 Posts.
    lightbulb Created with Sketch. 15645
    Interesting as well that each ' BULK ' rail car on average can carry around 115 tons each with your average ' Bulk ' carrying trains carrying around 3,200 - 3,500 tons in total.

    So 110 x 115 = 12,650 tons ...which averaging down would be around 4 round trips to Trois-Rivers with those 110 ' Bulk ' cars.

    So that's around C$3,399 per ton haulage to PORT at first glance.

    However , and by my math , the above figure is way to high on a per ton basis , so in my mind , this ' Fixed Price ' bulk tonnage haulage contract should be more like ONE QUARTER of that cost , and therefore around 50,600 tons of spodumene .

    And the contract would have to be ' Fixed ' right.....for a set volume of expected spodumene quoted by Sayona. Otherwise they wouldn't have agreed to this $43 million contract.

    So for me , it looks very much like what Sayona expects to produce between now and perhaps end of June 2023. Then again , if we were to HALF the haulage cost per ton again to around C$425 per ton , we would be looking a around just over 100,000 tons of spod shipped to port under this assumed ' Fixed ' priced contract.



 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.001(4.17%)
Mkt cap ! $236.7M
Open High Low Value Volume
2.4¢ 2.5¢ 2.3¢ $337.1K 14.25M

Buyers (Bids)

No. Vol. Price($)
64 14483458 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 5943785 11
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.