BRU 2.63% 7.8¢ buru energy limited

Ann: Rafael 3D Seismic Survey Early Insights Update, page-7

  1. 422 Posts.
    lightbulb Created with Sketch. 156
    The only concern I have is whether the selection of the development partner (eg in Q2 2024) comes too late for drilling to take place before the 2024 wet season. I realise some long lead items have been ordered but in my ignorance I would have thought that the rig would have to be ordered before the partner is selected if the required timeline is to be met. Could somebody please allay my concern?
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
7.8¢
Change
0.002(2.63%)
Mkt cap ! $52.36M
Open High Low Value Volume
8.3¢ 8.3¢ 7.8¢ $24.38K 304.9K

Buyers (Bids)

No. Vol. Price($)
1 26672 7.8¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 149741 2
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.