MGT magnetite mines limited.

Ann: Razorback Iron Ore Project Drilling Commences, page-9

  1. 249 Posts.
    lightbulb Created with Sketch. 151
    The drilling will supply the metallurgical testwork program with up to 8500kg of
    drill core material to undertake detailed comminution, grinding, flotation and
    characterisation testwork. The results of the testwork will inform process design and
    engineering criteria for the processing plant and provide excellent coverage and delineation
    of early-year processing needs. Associated drilling testwork will include high resolution Davis
    Tube Recovery (DTR) testwork, together with downhole geophysical testwork, geochemical
    analysis and characterisation studies. In tandem with the Iron Peak drilling and sampling
    program, existing drill core samples are being submitted to globally-recognised laboratory
    Bureau Veritas for testwork towards confirming metallurgical inputs for processing
    engineering design at the Razorback Prospect.

    Thats why Daz08


 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
8.3¢
Change
0.000(0.00%)
Mkt cap ! $10.04M
Open High Low Value Volume
8.5¢ 8.5¢ 8.3¢ $1.996K 23.90K

Buyers (Bids)

No. Vol. Price($)
1 1000 8.3¢
 

Sellers (Offers)

Price($) Vol. No.
9.0¢ 2000 1
View Market Depth
Last trade - 14.49pm 01/07/2025 (20 minute delay) ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.