The drilling will supply the metallurgical testwork program with up to 8500kg of
drill core material to undertake detailed comminution, grinding, flotation and
characterisation testwork. The results of the testwork will inform process design and
engineering criteria for the processing plant and provide excellent coverage and delineation
of early-year processing needs. Associated drilling testwork will include high resolution Davis
Tube Recovery (DTR) testwork, together with downhole geophysical testwork, geochemical
analysis and characterisation studies. In tandem with the Iron Peak drilling and sampling
program, existing drill core samples are being submitted to globally-recognised laboratory
Bureau Veritas for testwork towards confirming metallurgical inputs for processing
engineering design at the Razorback Prospect.
Thats why Daz08
- Forums
- ASX - By Stock
- Ann: Razorback Iron Ore Project Drilling Commences
MGT
magnetite mines limited.
Add to My Watchlist
3.75%
!
8.3¢

The drilling will supply the metallurgical testwork program with...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
8.3¢ |
Change
0.003(3.75%) |
Mkt cap ! $10.04M |
Open | High | Low | Value | Volume |
8.0¢ | 8.5¢ | 7.9¢ | $19.41K | 232.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 49916 | 8.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.5¢ | 42376 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49916 | 0.083 |
1 | 30500 | 0.082 |
2 | 15500 | 0.080 |
2 | 37500 | 0.078 |
2 | 94935 | 0.077 |
Price($) | Vol. | No. |
---|---|---|
0.085 | 42376 | 1 |
0.090 | 2000 | 1 |
0.095 | 51200 | 2 |
0.099 | 20000 | 1 |
0.100 | 254719 | 2 |
Last trade - 15.46pm 30/06/2025 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |