From stock head today - a less technical summary of today's announcement.
The company booked a material upgrade to its Indicated resource, which rose 50% to 1.5 billion tonnes.For Magnetite Mines (ASX:MGT), a diligent and methodical approach to developing its Razorback High Grade Iron Ore Concentrate Project continues to pay off, after the company announced an important new resource upgrade this morning.
The upgrade is the result of MGT’s advanced pre-feasibility study (PFS), which involved a re-modelling of the deposits using gridded seam modelling software (MINEX) to improve geological understanding of mineralisation distribution distribution therefore optimise mining assumptions..
The high-resolution modelling, carried out in partnership with McElroy Bryan Geological Services (MBGS) and Widenbar and Associates, allowed MGT to further optimise its mineral resource estimate.
Of particular note is the fact that MGT’s Indicated mineral resource – where an assessment can be made at a higher level of confidence than an Inferred mineral resource, in line with JORC standards – has now increased materially.
MGT announced a 50 per cent improvement in the total Indicated mineral resource at Razorback, to 1.5 billion tonnes.
Combined with an Inferred mineral resource of 1.5 billion tonnes, total tonnage at the site has now increased to 3 billion tonnes.
Major upgrade
Commenting on the upgrade, MGT’s technical director Mark Eames said the company now has a “firm foundation” to optimise the project as the PFS nears completion.
“This resource upgrade is the result of 12 months of systematic and careful work by our company’s geology team working closely with our trusted external advisers,” Eames said.
He added the milestone is an “essential step” in completing the PFS. And investors can expect more updates in the near future, with the PFS on track for completion by the end of June.
Importantly, the advanced geological study confirmed that MGT can now include the majority of the near-surface weathering zone at Razorback as an Indicated resource.
Indicated mineral resources are an important step forward from Inferred mineral resources, and the 50 per cent uplift means MGT now has “sufficient detail to support mine planning and evaluation of the economic viability of the deposit”, the company said.
MGT also announced that the latest stage of testing resulted in higher mass recovery levels, to 15.8% (up from 15.3%).
The higher mass recovery levels makes the deposit more amenable to mineral processing and “should lead to better overall concentrate recovery”, MGT said.
All in all, the mineral resources upgrade marks another exciting step forward for the Magnetite team, as it takes a diligent approach to proving out a high-level mineral mineral resource as iron ore prices stay elevated near all-time highs.
Institutional investors are on board, after the company raised $7m in a share placement earlier this month to advance the project through its next key stages of development.
With the PFS scheduled for completion by the end of June, MGT expects to have more exciting news flow in the months ahead as it looks to become Australia’s next major iron ore success story.
“We would like to thank our external advisers, McElroy Bryan Geological Services, Widenbar and Associates and Mr Richard Harmsworth. Their support for our geology team was pivotal in this work,” Eames said.
- Forums
- ASX - By Stock
- Ann: Razorback Iron Ore Project Mineral Resource Upgrade
From stock head today - a less technical summary of today's...
-
- There are more pages in this discussion • 187 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.5¢ |
Change
-0.005(1.92%) |
Mkt cap ! $26.06M |
Open | High | Low | Value | Volume |
25.5¢ | 26.0¢ | 25.5¢ | $7.843K | 30.66K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 54153 | 25.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.0¢ | 9600 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 51365 | 0.250 |
1 | 2273 | 0.245 |
2 | 17500 | 0.240 |
1 | 13636 | 0.220 |
4 | 10750 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.280 | 2562 | 1 |
0.290 | 4281 | 1 |
0.300 | 6840 | 2 |
0.305 | 42319 | 1 |
0.315 | 10300 | 1 |
Last trade - 13.43pm 02/08/2024 (20 minute delay) ? |
Featured News
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
MGT (ASX) Chart |