I agree with the credit raise.
"Detailed DFS-level engineering is planned to resume in Q1 2024 and will bring all elements of the Projectto AACE Class 3 or equivalent levels of accuracy, with completion scheduled in H2 2024, subject toappropriate funding" page 3.
That sentence alone says they're going to drop one at the start of the year. I know I'm dreaming, but maybe an offtake partner can step in at that point to foot the bill before they start shaking their cup at us again.
- Forums
- ASX - By Stock
- Ann: Razorback Iron Ore Project Update
I agree with the credit raise. "Detailed DFS-level engineering...
-
-
- There are more pages in this discussion • 111 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
|
|||||
Last
28.5¢ |
Change
-0.015(5.00%) |
Mkt cap ! $28.05M |
Open | High | Low | Value | Volume |
30.5¢ | 30.5¢ | 28.5¢ | $87.57K | 298.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 21641 | 28.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.5¢ | 61393 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 21641 | 0.285 |
6 | 236515 | 0.280 |
7 | 112668 | 0.270 |
4 | 124748 | 0.265 |
4 | 200680 | 0.260 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 61393 | 2 |
0.315 | 10300 | 1 |
0.330 | 26599 | 2 |
0.335 | 25000 | 1 |
0.360 | 5714 | 1 |
Last trade - 15.54pm 22/07/2024 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |