I'm unclear now after 3 months, has the result been communicated? Could somebody advise if I missed anything?
Below is from the latest quarterly report dated 1st of Feb, it seems the text in bold says the result has been announced - and it was not as good as expected?
A reverse circulation (RC) drilling program was also completed at the Blue Rock Valley Project during the Quarter with 7 RC holes completed for 1,153 metres. The program was designed to test a series of EM conductors, identified by Airborne EM and ground EM surveys, considered prospective for sulphide mineralisation occurrences. Drilling intersected low levels (<5%) of copper carbonate mineralisation, malachite ± azurite, in three drill holes (holes BRRC003 - BRRC005). Copper carbonates were intersected over a 3m interval (7-10m) in drill hole BRRC003, over a 7m interval (7-14m) in drill hole BRRC004 and over a 3m interval in drill hole BRRC005.
- Forums
- ASX - By Stock
- Ann: RC Drilling commences at Blue Rock Valley- Copper Project
I'm unclear now after 3 months, has the result been...
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TG1 (ASX) to my watchlist
|
|||||
Last
2.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.459M |
Open | High | Low | Value | Volume |
2.7¢ | 2.7¢ | 2.7¢ | $503 | 18.61K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 372754 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 17300 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 372754 | 0.027 |
2 | 1568000 | 0.026 |
2 | 1110000 | 0.025 |
1 | 47617 | 0.021 |
4 | 200049 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 17300 | 1 |
0.031 | 300000 | 1 |
0.034 | 14000 | 1 |
0.035 | 152698 | 1 |
0.036 | 77805 | 2 |
Last trade - 11.15am 08/08/2024 (20 minute delay) ? |
Featured News
TG1 (ASX) Chart |