CNB 1.27% 78.0¢ carnaby resources limited

Ann: RC Drilling Commences at Strelley Gold Project - Pilbara, WA, page-307

  1. 82 Posts.
    lightbulb Created with Sketch. 15
    I'm in NZ and wondering about the covid/lockdown situation over there. Is that having an effect on labs, drills and general work on site?
 
watchlist Created with Sketch. Add CNB (ASX) to my watchlist
(20min delay)
Last
78.0¢
Change
-0.010(1.27%)
Mkt cap ! $134.1M
Open High Low Value Volume
79.0¢ 80.0¢ 75.0¢ $104.7K 134.8K

Buyers (Bids)

No. Vol. Price($)
3 11558 76.0¢
 

Sellers (Offers)

Price($) Vol. No.
78.0¢ 4826 1
View Market Depth
Last trade - 16.10pm 27/05/2024 (20 minute delay) ?
Last
77.0¢
  Change
-0.010 ( 2.52 %)
Open High Low Volume
79.0¢ 79.0¢ 75.5¢ 47195
Last updated 15.59pm 27/05/2024 ?
CNB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.