CSA's modelling on East Sampson Dam available in September? - they said 3rd Qtr - so that's not far away...
Phase 2 of the 2020 RC drill program is scheduled for September to coincide with aircore drilling of
existing auger geochemical anomalies in peripheral areas of the main mineralised zone at East
Sampson Dam. Six diamond holes will also be drilled to generate samples for further metallurgical
testwork and structural and geotechnical studies.
Infill auger sampling will be undertaken to further delineate the geochemical anomalies prior to
carrying out the phase 2 RC and air core drilling. CSA Global (CSA) has been engaged to undertake
geological modelling of gold mineralisation at the East Sampson Dam gold project. This work will
identify additional work requirements to advance the project so that an appropriate level of JORC
Mineral Resource can be defined. The JORC Resources will provide a firm basis for planning optimum
mining and gold recovery operations for input into the scoping study and to determine likely key
financial outcomes.
Desktop mine project evaluation by Moho’s consultant mining engineer Minero is ongoing.
Minecomp Pty Ltd, a Kalgoorlie-based mine planning company, has been engaged to undertake first
pass Whittle optimisation using preliminary grade blocks assessed and provided by CSA, to determine
the likely mining inventory for the project.
RC samples have been delivered to JT Metallurgical Services Pty Ltd for test work to provide
preliminary information for toll treatment by Carbon-in-Leach and possible on-site heap leaching.
This work includes studies focusing on rheology and crush size sensitivity, agglomeration/percolation
tests and gold liberation and recovery characteristics.
The East Sampson Dam gold prospect is a key element of the Silver Swan North Project which is well
located close to existing gold processing facilities and mining infrastructure. Moho believes that, if
mineralisation is extended and a suitable gold resource established, it could provide an important
cash flow for the Company.
- Forums
- ASX - By Stock
- MOH
- Ann: RC drilling to commence at East Sampson Dam Gold Prospect
Ann: RC drilling to commence at East Sampson Dam Gold Prospect, page-56
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MOH (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.235M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 336666 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 846000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 170000 | 0.006 |
7 | 2594333 | 0.005 |
17 | 4344807 | 0.004 |
7 | 5266606 | 0.003 |
4 | 10450000 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 810000 | 1 |
0.008 | 5209170 | 6 |
0.009 | 2994022 | 4 |
0.010 | 199004 | 2 |
0.011 | 304442 | 2 |
Last trade - 16.12pm 01/11/2024 (20 minute delay) ? |
Featured News
MOH (ASX) Chart |
Day chart unavailable