Based on the depths planned etc I would guesstimate a timetable of 5-6 days to drill and two weeks from finish for results, so third week in July sometime for the all important results? But importantly they will be able to see sulphides if they drill through them so whilst Lodestar won't be able to tell if it's mineralised they will know they are in the right stuff, as the prior mineralised holes had associated sulphides.
Contessa was always the safe bet and a target I wanted them to get back to and drill further, this should be a solid campaign.
- Forums
- ASX - By Stock
- Ann: RC Drilling Underway at Contessa-LSR.AX
Based on the depths planned etc I would guesstimate a timetable...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LSR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.600M |
Open | High | Low | Value | Volume |
0.1¢ | 0.2¢ | 0.1¢ | $1.858K | 1.713M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 48709136 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 81197637 | 33 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 48709136 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 81197632 | 32 |
0.003 | 42130972 | 12 |
0.004 | 14070186 | 9 |
0.005 | 9063010 | 4 |
0.006 | 2278520 | 2 |
Last trade - 14.41pm 22/08/2024 (20 minute delay) ? |
Featured News
LSR (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online