LSR 0.00% 0.1¢ lodestar minerals limited

Based on the depths planned etc I would guesstimate a timetable...

  1. 6,955 Posts.
    lightbulb Created with Sketch. 595
    Based on the depths planned etc I would guesstimate a timetable of 5-6 days to drill and two weeks from finish for results, so third week in July sometime for the all important results? But importantly they will be able to see sulphides if they drill through them so whilst Lodestar won't be able to tell if it's mineralised they will know they are in the right stuff, as the prior mineralised holes had associated sulphides.

    Contessa was always the safe bet and a target I wanted them to get back to and drill further, this should be a solid campaign.
 
watchlist Created with Sketch. Add LSR (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.600M
Open High Low Value Volume
0.1¢ 0.2¢ 0.1¢ $1.858K 1.713M

Buyers (Bids)

No. Vol. Price($)
17 48709136 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 81197637 33
View Market Depth
Last trade - 14.41pm 22/08/2024 (20 minute delay) ?
LSR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.