The LIBS analyser would have been used, but the readings can't be published. With the new drilling program, the results will need to be calibrated against the analytical results when received, to improve accuracy. It could be used for follow up drilling or ensuring a hole didn't end in a litium zone.
- Forums
- ASX - By Stock
- Ann: RC Drilling Update for Pippingarra Quarry Project
The LIBS analyser would have been used, but the readings...
-
- There are more pages in this discussion • 87 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IND (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.46M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 116 | 17.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 60677 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 116 | 0.170 |
1 | 51000 | 0.155 |
5 | 181666 | 0.150 |
3 | 23578 | 0.140 |
1 | 10000 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 60677 | 2 |
0.200 | 14500 | 2 |
0.205 | 25000 | 1 |
0.210 | 22321 | 1 |
0.250 | 12730 | 3 |
Last trade - 16.12pm 01/11/2024 (20 minute delay) ? |
Featured News
IND (ASX) Chart |
Day chart unavailable