NTG also shut down the possibility of TNG using the ITCHY Camp which is huge and TNG need a Huge camp 1600 Heads for construction.
NTEPA still have Traffic and Noise in play for the EIS so they are still looking at our Long Train and surely the noise would not be an issue in the middle of the desert
- Forums
- ASX - By Stock
- Ann: Receipt of Section 203D Notice
NTG also shut down the possibility of TNG using the ITCHY Camp...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $87.86M |
Open | High | Low | Value | Volume |
5.3¢ | 5.3¢ | 5.0¢ | $138.3K | 2.685M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 371924 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 661856 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 371924 | 0.051 |
2 | 22778 | 0.050 |
1 | 300000 | 0.049 |
4 | 520000 | 0.048 |
1 | 250000 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 661856 | 1 |
0.055 | 55000 | 1 |
0.056 | 13000 | 1 |
0.060 | 50000 | 1 |
0.061 | 58237 | 1 |
Last trade - 16.10pm 08/08/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |