GTR 0.00% 0.5¢ gti energy ltd

Ann: Recommencement of Drilling at Thor ISR Uranium Project, page-10

  1. 11,131 Posts.
    lightbulb Created with Sketch. 4590
    40% of the drilling program was completed in the 18 days (30/11/21 to 17/12/21). You would think 60% remaining would get done in the 34 days (10/2/22 to 15/3/22). Basic ratios.

 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $10.25M
Open High Low Value Volume
0.5¢ 0.6¢ 0.4¢ $146.9K 29.26M

Buyers (Bids)

No. Vol. Price($)
4 1472236 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 4852194 14
View Market Depth
Last trade - 16.10pm 19/06/2024 (20 minute delay) ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.