GTR 0.00% 0.4¢ gti energy ltd

40% of the drilling program was completed in the 18 days...

  1. 11,240 Posts.
    lightbulb Created with Sketch. 4649
    40% of the drilling program was completed in the 18 days (30/11/21 to 17/12/21). You would think 60% remaining would get done in the 34 days (10/2/22 to 15/3/22). Basic ratios.

 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $10.15M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
57 39611511 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 12762606 15
View Market Depth
Last trade - 10.04am 02/07/2024 (20 minute delay) ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.