GTR 0.00% 0.3¢ gti energy ltd

40% of the drilling program was completed in the 18 days...

  1. 11,652 Posts.
    lightbulb Created with Sketch. 4817
    40% of the drilling program was completed in the 18 days (30/11/21 to 17/12/21). You would think 60% remaining would get done in the 34 days (10/2/22 to 15/3/22). Basic ratios.

 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $7.649M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $1.233K 411.0K

Buyers (Bids)

No. Vol. Price($)
5 8778206 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 19883852 23
View Market Depth
Last trade - 10.04am 22/08/2024 (20 minute delay) ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.