40% of the drilling program was completed in the 18 days (30/11/21 to 17/12/21). You would think 60% remaining would get done in the 34 days (10/2/22 to 15/3/22). Basic ratios.
- Forums
- ASX - By Stock
- Ann: Recommencement of Drilling at Thor ISR Uranium Project
40% of the drilling program was completed in the 18 days...
-
- There are more pages in this discussion • 68 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.15M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
57 | 39611511 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 12762606 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
57 | 39611511 | 0.004 |
14 | 9137166 | 0.003 |
6 | 10699000 | 0.002 |
5 | 9700000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 12762606 | 15 |
0.006 | 14552792 | 19 |
0.007 | 3595002 | 8 |
0.008 | 2649000 | 7 |
0.009 | 2420740 | 7 |
Last trade - 10.04am 02/07/2024 (20 minute delay) ? |
Featured News
GTR (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online