GTR 0.00% 0.5¢ gti energy ltd

334m a day drill rate / 9000m left in drill program No delays...

  1. 40 Posts.
    lightbulb Created with Sketch. 12
    334m a day drill rate / 9000m left in drill program
    No delays from rig down time or weather included.

    I thought a heard bruce hinted at drilling the other tenaments later in the year so i wonder if they fall under the same permit issues or the same permit.
 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $10.25M
Open High Low Value Volume
0.5¢ 0.6¢ 0.4¢ $146.9K 29.26M

Buyers (Bids)

No. Vol. Price($)
4 1472236 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 4852194 14
View Market Depth
Last trade - 16.10pm 19/06/2024 (20 minute delay) ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.