334m a day drill rate / 9000m left in drill program
No delays from rig down time or weather included.
I thought a heard bruce hinted at drilling the other tenaments later in the year so i wonder if they fall under the same permit issues or the same permit.
- Forums
- ASX - By Stock
- Ann: Recommencement of Drilling at Thor ISR Uranium Project
334m a day drill rate / 9000m left in drill program No delays...
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add GTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.16M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $1K | 250K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
41 | 19358181 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 18452331 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
37 | 18208181 | 0.004 |
49 | 32014449 | 0.003 |
29 | 40387979 | 0.002 |
8 | 17799950 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 18251051 | 18 |
0.006 | 9278703 | 9 |
0.007 | 3180000 | 3 |
0.008 | 3171388 | 6 |
0.009 | 3000000 | 2 |
Last trade - 13.24pm 04/10/2024 (20 minute delay) ? |
Featured News
GTR (ASX) Chart |