GTR 0.00% 0.3¢ gti energy ltd

334m a day drill rate / 9000m left in drill program No delays...

  1. 40 Posts.
    lightbulb Created with Sketch. 12
    334m a day drill rate / 9000m left in drill program
    No delays from rig down time or weather included.

    I thought a heard bruce hinted at drilling the other tenaments later in the year so i wonder if they fall under the same permit issues or the same permit.
 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $7.649M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $50.26K 16.75M

Buyers (Bids)

No. Vol. Price($)
3 8439147 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 19574335 22
View Market Depth
Last trade - 13.52pm 21/08/2024 (20 minute delay) ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.