GTR 0.00% 0.6¢ gti energy ltd

334m a day drill rate / 9000m left in drill program No delays...

  1. 37 Posts.
    lightbulb Created with Sketch. 12
    334m a day drill rate / 9000m left in drill program
    No delays from rig down time or weather included.

    I thought a heard bruce hinted at drilling the other tenaments later in the year so i wonder if they fall under the same permit issues or the same permit.
 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $12.3M
Open High Low Value Volume
0.6¢ 0.6¢ 0.6¢ $17.60K 2.933M

Buyers (Bids)

No. Vol. Price($)
6 1519434 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 5618006 12
View Market Depth
Last trade - 15.30pm 22/05/2024 (20 minute delay) ?
Last
0.6¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.6¢ 0.6¢ 0.6¢ 2197230
Last updated 12.13pm 22/05/2024 ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.