GTR 12.5% 0.5¢ gti energy ltd

Ann: Recommencement of Drilling at Thor ISR Uranium Project, page-71

  1. 337 Posts.
    lightbulb Created with Sketch. 61
    the 3 month pause is a condition on the drill permit. They've clearly disclosed it to the public in the attached footnote.

    They don't need to apply for anything additional for the 2022 drilling program.

    https://hotcopper.com.au/data/attachments/4156/4156909-38595d7551d71bed9e5956437eae2357.jpg



 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.