It is a normal administrative process, and the temporary permit is valid while the reconsideration is underway. Plus, no application for reconsideration was received by the deadline of May 30, 2024, for the temporary permit, so the temporary permit status remains granted. It is great to see Bruce and the management were well prepared for any unexpected actions from some protagonists in the area and have the temporary permit ready so no work would be jeopardised.
When someone submits a request, as long as the procedure complies with government regulations, the government needs to take and consider it. This does not mean the rejection or halt of the project at all. In fact, we have been receiving strong support from the local and state government.
- Forums
- ASX - By Stock
- Ann: Reconsideration of Green River Water Extraction Right Grant
It is a normal administrative process, and the temporary permit...
-
- There are more pages in this discussion • 76 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
0.001(1.30%) |
Mkt cap ! $100.7M |
Open | High | Low | Value | Volume |
7.7¢ | 7.9¢ | 7.7¢ | $223.5K | 2.863M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 51589 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.8¢ | 7737 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 38602 | 0.077 |
4 | 215019 | 0.076 |
7 | 529583 | 0.075 |
5 | 224026 | 0.074 |
7 | 497986 | 0.073 |
Price($) | Vol. | No. |
---|---|---|
0.078 | 7737 | 1 |
0.079 | 856766 | 5 |
0.080 | 872434 | 7 |
0.081 | 976780 | 5 |
0.082 | 300000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |