I never once said SPR would require no extra CAPEX after the 90 million.
Of course, the plant will need updating.
The gold room will need overhauling, the TSF will need lifting, another crusher will need to be installed, a paste fill plant will need to be built, multiple underground levels need developing, NN open pit needs stripping, a ball mill will need to be added to the milling circuit.
- Forums
- ASX - By Stock
- RMS
- Ann: Record FY24 production of 293koz
Ann: Record FY24 production of 293koz, page-52
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RMS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.40 |
Change
-0.010(0.41%) |
Mkt cap ! $2.755B |
Open | High | Low | Value | Volume |
$2.41 | $2.42 | $2.34 | $10.32M | 4.328M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | $2.39 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.41 | 25502 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 2.390 |
1 | 5000 | 2.370 |
2 | 9879 | 2.360 |
1 | 8879 | 2.350 |
1 | 8879 | 2.340 |
Price($) | Vol. | No. |
---|---|---|
2.420 | 40629 | 3 |
2.430 | 11091 | 4 |
2.440 | 8879 | 1 |
2.450 | 17858 | 4 |
2.460 | 18381 | 2 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
RMS (ASX) Chart |