Red River aims to develop Liontown as its third deposit at Thalanga and is focusing on an open pit / underground development for the Liontown Project with a conceptual mine life of 10+ years. Mining at Liontown is expected to commence in CY2022.
- Forums
- ASX - By Stock
- RVR
- Ann: Red River intercepts 20% Zn Eq. at Liontown
Ann: Red River intercepts 20% Zn Eq. at Liontown, page-3
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)