As of 28th of May hole two was at 650ft, assuming we drill to 1500ft the deeper depth mentioned in announcement we had approx 28hrs of drilling to go at 10ft every 20minutes.
Drilling could have finished in May if two shifts were still in place
Results from lab 3-4 weeks, granted we are sending off a lot more samples so could be a little longer
Whilst results may still be a few weeks away it is fair to say as of next week we enter the window of waking up to a trading halt
Good luck all
- Forums
- ASX - By Stock
- Ann: Red Valley Drilling Update
As of 28th of May hole two was at 650ft, assuming we drill to...
Featured News
Add RMX (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.001(11.1%) |
Mkt cap ! $3.873M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $7.737K | 773.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 205651 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 1164337 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 2932039 | 0.009 |
20 | 4592179 | 0.008 |
7 | 2693391 | 0.007 |
6 | 2864861 | 0.006 |
1 | 1000000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 1164337 | 6 |
0.012 | 599389 | 5 |
0.013 | 1205585 | 4 |
0.014 | 932971 | 5 |
0.015 | 1632885 | 6 |
Last trade - 15.46pm 14/11/2024 (20 minute delay) ? |
Featured News
RMX (ASX) Chart |