Processing costs quoted at $18/t must be a typographic error. The last I heard was $46-50/t. Do they have a special relationship for treating ore at Norseman, or are they using 5 year old numbers for their cost of treatment at self owned plant at Burbanks?
Any old arrangement with the new plant owners for processing ore at Burbanks must have expired. Does the mining cost of $4.50/t apply per tonne of ore.... or cost of mining all materials (ore at $4.50/t and waste at $4.50/t?) What are the waste to ore ratios? Anyway the the whole set of numbers are vague.
They must have been caught short in their presentation by their arrangements for the Christmas party. I know it's just a resource upgrade and not a feasibility study, but still very unprofessional.
- Forums
- ASX - By Stock
- Ann: Redback Gold Project - Mineral Resource Update
Processing costs quoted at $18/t must be a typographic error....
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MXR (ASX) to my watchlist
|
|||||
Last
3.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.83M |
Open | High | Low | Value | Volume |
2.8¢ | 3.0¢ | 2.8¢ | $3.12K | 108.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 223214 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 104085 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 223214 | 0.028 |
1 | 37000 | 0.027 |
1 | 28000 | 0.026 |
2 | 539999 | 0.025 |
2 | 225000 | 0.024 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 104085 | 1 |
0.032 | 50000 | 1 |
0.033 | 45833 | 1 |
0.035 | 747757 | 3 |
0.037 | 53268 | 1 |
Last trade - 14.58pm 09/08/2024 (20 minute delay) ? |
Featured News
MXR (ASX) Chart |