Page 8: "The open pit optimisation used a gold metal price of AUD$2,500/Oz, a mining cost of $4.5/tonne, processing
costs of $18/tonne and an assumed processing recovery of 95% (oxide and transitional zones) and 93% (fresh
rock). Pit slope angles were determined by a geotechnical consultancy group Peter O’Bryan and Associates."
Obviously your lists from a previous ann (or your interpretation of the current ann). If you can read all of that into the current announcement, and I can not, what are you saying.... that I'm stupid? One of the sets of data is wrong. They haven't got time to proof read?
- Forums
- ASX - By Stock
- MXR
- Ann: Redback Gold Project - Mineral Resource Update
Ann: Redback Gold Project - Mineral Resource Update, page-49
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.5¢ |
Change
-0.001(2.17%) |
Mkt cap ! $19.25M |
Open | High | Low | Value | Volume |
4.5¢ | 4.5¢ | 4.5¢ | $2.031K | 45.13K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 187920 | 4.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 102980 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 187920 | 0.045 |
1 | 600000 | 0.043 |
2 | 175004 | 0.040 |
1 | 100000 | 0.037 |
2 | 400000 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 102980 | 2 |
0.048 | 16360 | 1 |
0.049 | 321920 | 6 |
0.050 | 1073567 | 4 |
0.051 | 15000 | 1 |
Last trade - 14.16pm 18/10/2024 (20 minute delay) ? |
Featured News
MXR (ASX) Chart |