Page 8: "The open pit optimisation used a gold metal price of AUD$2,500/Oz, a mining cost of $4.5/tonne, processing
costs of $18/tonne and an assumed processing recovery of 95% (oxide and transitional zones) and 93% (fresh
rock). Pit slope angles were determined by a geotechnical consultancy group Peter O’Bryan and Associates."
Obviously your lists from a previous ann (or your interpretation of the current ann). If you can read all of that into the current announcement, and I can not, what are you saying.... that I'm stupid? One of the sets of data is wrong. They haven't got time to proof read?
- Forums
- ASX - By Stock
- Ann: Redback Gold Project - Mineral Resource Update
Page 8: "The open pit optimisation used a gold metal price of...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.0¢ |
Change
0.002(7.14%) |
Mkt cap ! $12.83M |
Open | High | Low | Value | Volume |
2.8¢ | 3.0¢ | 2.7¢ | $72.85K | 2.582M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 245634 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 535166 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 245634 | 0.028 |
1 | 229271 | 0.027 |
1 | 55000 | 0.026 |
3 | 639999 | 0.025 |
1 | 200000 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 535166 | 1 |
0.032 | 740998 | 2 |
0.033 | 97818 | 1 |
0.034 | 200000 | 1 |
0.035 | 50000 | 1 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
2.8¢ |
  |
Change
0.002 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
2.7¢ | 2.9¢ | 2.7¢ | 461897 | ||
Last updated 13.37pm 14/06/2024 ? |
Featured News
MXR (ASX) Chart |