I was just reading through the Mining Management Plan for the upcoming Statigraphic Drillhole Proposal and I noticed under Section 4 they have listed 500m as the maximum depth of the propsed hole. Yet, in the recent Activities Report they've stated 5,000m, which seems much more probable as 500m wont even get us to the end of the pipes. Is this something that needs correcting, is it not a big deal or have I interpreted it wrong.
- Forums
- ASX - By Stock
- NTM
- Ann: Redbank Copper Ltd Presentation - GM July 2021
Ann: Redbank Copper Ltd Presentation - GM July 2021, page-39
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NTM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.104M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NTM (ASX) Chart |
Day chart unavailable
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online