@vinnie48 (Hotcopper won't post if I "reply")
"We're still in speculation territory for what it means financially" – I'm a speculator, so here I go!My tiny tadpole heart is momentarily brimming with ... well, not exactly optimism, but ... less pessimism?
- The Optus Daintree site has six ZBM2s: https://redflow.com/optus-daintree/
- That was a fully off-grid install, so six might be overkill for sites with grid connections.
- There has to be at least one battery at each site.... or it's not a site.
- I'm not sure how long a single battery would power a mobile tower, but in any case there's the risk of needing the battery while it's in its maintenance cycle. This is why@NavyDiver has two batteries.
- So I'm plumping for a minimum of two batteries for a minimum total of 112.
- As I understand it STAND is looking for a minimum of 48 hours of off-grid operation, so four seems more realistic (at 10kWh each) for a reasonable guess of 224 units.
- Forums
- ASX - By Stock
- RFX
- Ann: Redflow and Optus Resiliency Initiative Announced
Ann: Redflow and Optus Resiliency Initiative Announced, page-26
-
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.63M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
RFX (ASX) Chart |
Day chart unavailable