So NWM are waiting on Bali south Heritage Study with no time schedule before exploration starts again. At AW drilling to commence next month so 2-3 months before results and the CR shortfall due next month (and at what price/dilution) on the heals of a bad metalergy analysis.
Not looking good at near term here. In the bottom draw for now until some decent exit price. Lost confidence in the BOD
Wish shareholder best of luck with NWM.
GLAH
- Forums
- ASX - By Stock
- Ann: REE recovery test-work to commence
So NWM are waiting on Bali south Heritage Study with no time...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.67M |
Open | High | Low | Value | Volume |
2.2¢ | 2.2¢ | 2.2¢ | $17.08K | 776.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 300000 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 480016 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 300000 | 0.021 |
1 | 200000 | 0.020 |
1 | 500000 | 0.019 |
2 | 1000000 | 0.018 |
2 | 205890 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 480016 | 2 |
0.024 | 602566 | 3 |
0.025 | 75000 | 1 |
0.027 | 524616 | 2 |
0.030 | 15000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
NWM (ASX) Chart |