LOM 5.00% 6.3¢ lucapa diamond company limited

I agree. But what I hadn't picked up earlier was that they have...

  1. 4,940 Posts.
    lightbulb Created with Sketch. 287
    I agree. But what I hadn't picked up earlier was that they have dug 2 holes in L71 and pulled about 2000t from each, hence the 4000t which is all from L71.
    I'm not sure if they have dug one or two holes in L72. Would probably make good sense to keep the rock from each pit separate though, so it will probably be mid next week before all rock is processed.

    From June 26:
    The L071 kimberlite sample will be the first of the kimberlites in the Canguige catchment area to be
    bulk sampled (Figure 1). L071 is estimated to be ~30ha in size at surface. Two bulk sample locations
    have been chosen at L071,
    where the completed delineation drilling showed the targeted
    volcaniclastic kimberlite (“VK”) was hosted.

    It appears to me that L72 excavation had only just commenced at the AGM presentation, I think the two holes in that presentation are both L71. The L72 hole looks like a pentagon in the 10 Aug announcement.
 
watchlist Created with Sketch. Add LOM (ASX) to my watchlist
(20min delay)
Last
6.3¢
Change
0.003(5.00%)
Mkt cap ! $18.27M
Open High Low Value Volume
6.3¢ 6.3¢ 6.3¢ $1.575K 25K

Buyers (Bids)

No. Vol. Price($)
1 326779 6.0¢
 

Sellers (Offers)

Price($) Vol. No.
6.3¢ 77775 5
View Market Depth
Last trade - 10.04am 02/07/2024 (20 minute delay) ?
LOM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.