KPO 0.00% 1.1¢ kalina power limited

Just a reminder, from the teaser last year.Estimated cost to...

  1. 11,114 Posts.
    lightbulb Created with Sketch. 1855
    Just a reminder, from the teaser last year.

    Estimated cost to build each ~200MW plant with CCS, total cost ~$917m. Net cost with the now legislated ITC ~$601m

    There is still the additional credits proposed by the Alberta government and the Canadian government that, if passed, will reduce the net cost even further to ~$517m
    Last edited by Surandy70: 21/06/24
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.