Naah, that's too much of a pain in the backside from any number of angles. Far easier to do the tailings dam PROPERLY - sonic drilling, volumetric survey, bulk density measurements, blanks and standards - you know, all the stuff that goes into a Table 1.
HAO Price at posting:
23.0¢ Sentiment: None Disclosure: Held