Excellent news.
This will decrease the costs it takes to process the iron. As I have mentioned before, electrical processing power requirements are dropping year to year. Having capacity to handle 5mTpa plus expansion means that as these processing plant equipment become less power demanding, processing can increase as MGT do not need a new transmission line.
- Forums
- ASX - By Stock
- MGT
- Ann: Renewable Grid Power For Razorback Project
Ann: Renewable Grid Power For Razorback Project, page-2
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
(20min delay)
|
|||||
Last
30.5¢ |
Change
0.005(1.67%) |
Mkt cap ! $30.02M |
Open | High | Low | Value | Volume |
30.0¢ | 30.5¢ | 30.0¢ | $51.59K | 169.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 128999 | 30.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.5¢ | 35523 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 128999 | 0.300 |
4 | 35689 | 0.295 |
8 | 86150 | 0.290 |
3 | 20099 | 0.285 |
2 | 28140 | 0.280 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 35523 | 1 |
0.315 | 52000 | 1 |
0.320 | 18114 | 2 |
0.330 | 33657 | 1 |
0.340 | 10300 | 1 |
Last trade - 15.31pm 12/07/2024 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |