IPT 8.33% 2.2¢ impact minerals limited

looks like some answers for now have appeared with in the recent...

  1. 178 Posts.
    lightbulb Created with Sketch. 68
    looks like some answers for now have appeared with in the recent update finally. end of june and sept should be interesting. add in the Mystery news of spod results at some stage plus broken hill IGO updates.

    they are spread very wide for a small company, hopefully they can remain on task and keep on time frames.


    - made visual guesstimates of li

    no mention of results from surface rock scratchings - still waiting - end of July early Sept est.

    - over due samples from Hopetoun - Silverstar this month - was meant to be june - perhaps lostas below with in doonia - end of July receive est. results in august est.
    - over due at Doonia for results

    page 1"Assay results from two drill holes at Doonia have been received and are being interpreted,
    with the assays from the remaining four other holes at Doonia, as well as the final assays from the
    diamond drill programme at Hopetoun, due shortly."
    end of July receive est. results in august est.

    page 3 "Drill programmes at Doonia and Hopetoun were completed earlier this year. Drill assays have been
    considerably delayed but results are due by the end of July.
    Soil geochemistry surveys have been completed at both projects to help define follow up drill targets.
    Assays results from these surveys are also due by the end of July."end of July stated


    page 1 "Assay results from two drill holes at Doonia have been received and are being interpreted" end of July early august est.

    - over due - Arkun beau had an em survey - data was meant to be received in late June and processed. nothing yet.
    page 2 "An extensive airborne HELITEM electromagnetic and magnetic survey comprising 920 line
    kilometres was completed in 7 blocks covering the priority soil geochemistry targets identified at
    Beau and Arkun (Figures 2 and 3). Final survey data has now been received and further
    processing and interpretation of the data is underway with results expected later this Quarter."
    end of Sept est.

    - finally received in may - land access negations for Arkun - as above

    page 3 "As a result of the Land Access Agreements, Impact has been able to complete several campaigns
    of field checking, soil geochemistry and rock chip sampling across some of the priority targets for
    Ni-Cu-PGE. A total of 949 soil samples and 171 rock chip samples have been collected and
    submitted for assay. First results are due by the end of July
    " First results are due by the end of July.

 
watchlist Created with Sketch. Add IPT (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.002(8.33%)
Mkt cap ! $63.02M
Open High Low Value Volume
2.3¢ 2.4¢ 2.2¢ $54.63K 2.393M

Buyers (Bids)

No. Vol. Price($)
8 1331623 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 561897 3
View Market Depth
Last trade - 15.42pm 09/05/2024 (20 minute delay) ?
Last
2.2¢
  Change
-0.002 ( 6.52 %)
Open High Low Volume
2.3¢ 2.3¢ 2.1¢ 1577734
Last updated 15.32pm 09/05/2024 ?
IPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.