I'd suggest it'll be next year before they get any holes drilled; first they've said they're going to fly a detailed geophysics survey, then they'll have to interpret the results of the survey, then plan a drill program, then set up a new camp, then get their drill gear into position, then drill. Generally, allow 12 months from the survey to drill. Meanwhile the rona's ramping up and only fully vaccinated expats are allowed in country (not too many in Aussie at the mo') ... and as you mention there's the not inconsiderable matter of assay timing .. which needs the drill core samples sent out of the country..
- Forums
- ASX - By Stock
- Ann: Renounceable Rights Issue
I'd suggest it'll be next year before they get any holes...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(33.3%) |
Mkt cap ! $7.814M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $127.2K | 55.09M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
34 | 54296129 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 23016317 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 53041129 | 0.002 |
20 | 88390049 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 23016317 | 3 |
0.004 | 26304524 | 17 |
0.005 | 9703323 | 15 |
0.006 | 8184522 | 8 |
0.007 | 2836786 | 8 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
GMN (ASX) Chart |