The Announcement on the 15th said that testing would run for another 3 to 10 days after which the wells would be shut in to allow downhole pressure buildup measurements .
We might get an Announcement by next Monday that will inform us of the final CG ratios that are so important to the economics of the project .
The ratio for the flush production from the lower Montney were off the dial good and am hoping the final ratios will better than expected too .
The test for the upper Montney was still flowing back a lot of frac fluid and if that proves up economical pay it will be a big boost to the value of the project .
Reaction of the Market has been muted so far .
I think the times are right for this project very soon and have made my already over allocated under water holding bigger .
We may be at a turning point .
The Announcement on the 15th said that testing would run for...
Add to My Watchlist
What is My Watchlist?