2018: "we're restructuring to control costs"
2019: "we're restructuring to control costs"
2020: "we're restructuring to control costs"
2021: "we're restructuring to control costs"
2022: "we're restructuring to control costs"
2023: "we're restructuring to control costs"
2024: "we're restructuring to control costs"
No worries, boss.
- Forums
- ASX - By Stock
- Ann: Request for Extension of Voluntary Suspension
2018: "we're restructuring to control costs"2019: "we're...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LNU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.09M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LNU (ASX) Chart |
Day chart unavailable
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online