I don’t think space will be a problem.
This is great news and is a major step in de-risking the project IMO.
Any increase in capacity doesn’t require multiple trains to be added to the facility only an increase in the existing size of equipment already in the flow sheet.
Hence the increase in output and consequently return by bumping up the capacity if required. Which it sounds like it might be.
It’s all in the presentations.
.
Add to My Watchlist
What is My Watchlist?