    Before the Production Test proper commences the wells need to be "cleaned up".
    This involves producing out the fluids introduced during the Frac stage.
    As stated in Calima's news release introduced fluids are gradually replaced with virgin well bore fluids and only then can meaningful production rates be calculated. This clean up period is time variable and can possibly involve nitrogen lift via coil tubing if required.
 